These photos will (hopefully) record the construction of our Bruce Roberts
'Centennial Spray 38'.
MANY thanks to Blair Boats for making the project happen!
Click here to go back to the Index
Mid September 2001. The hull has been primed with 2 coats of epoxy Everdure, and all of the laminated ringframes and keel floors have been bonded to the interior. The Everdured hull was abraded prior to fastening the framing down, and all of the frames have been constructed from Sapele. The next task will be to start fitting bulkheads and engine beds. |
|